FEATURE ARTICLE

TABLE 2—TSAC VERSUS CONVENTIONAL ORGANIC COATINGS

Features

Organic coating system

TSA + sealer coat

Surface preparation

25-50 micron (S a 2

1/ 2

)

>65 micron (S a 3)

Process temperature

Ambient

Torch at >1000

0

C

Metallizing at >675

0

C

Substrate at 120-150

0

C

Productivity

200 m

2

per shift

20-25 m

2

/shift

Accessibility

Using brush can cover entire area

Coating of nooks and corners, T-welds,

assembled components, and recess

areas is nearly impossible.

Welding/repair/rework

Possible

Questionable

Hot permit

Not required

Required (even at later stage)

Safety

Minimum protection

Complete protection (metal fumes, UV,

thermal radiation and noise hazard)

Contractors

Quality contractors are easily

available

Limited vendor base with proven capability

Handling of coated components

Not an issue

Same quality cannot be restored

Corrosion protection in splash zone

Other proven coating systems

are available. 1500 microns

DFT are specified.

Adequate TSA coating (200 microns)

for splash zone

Operator shift time

One operator can work continuously

Need to relieve operator after

maximum of two hours

Top coat application

Primers are available where coating

interval can vary up to six months

Immediate sealer coating (within six hours)

Rework on splash zone

Systems are available

Difficult to achieve surface finish and coating

application in low tide duration

low lifecycle costs. These benefits outweigh the drawbacks,

which include the necessity of using a hot process, sensitiv-

ity to dust, wind, and moisture, potential for operator error,

and shock and noise hazards.

The procedural details, readiness report, and inspec-

tion checklist were prepared to ensure guaranteed quality

in every aspect of this project. Thermal spray aluminum re-

quires rigorous process control over the entire operational

sequence, from initial blasting to spraying the final sealer

coat. Specifications provided by the client, PMC, were quite

stringent, with required parameters that are only achiev-

able at laboratory scale. Interactions with PMC engineers

regarding various technical issues served to make the pro-

cess conditions less stringent while adhering to internation-

ally accepted parameters. Issues such as adhesion bond

strength, procedure qualification record, surface prepara-

tion, dew point, and final shade of sealer coat on the jacket

splash zone were all successfully resolved.

Table 2 summarizes limitations of TSAC with respect to

widely adopted organic coatings for the splash zone. When

the coating application is to be done “in yard,” constraints

are imposed such as absence of control over environmental

conditions. Further, because in-yard application occurs in an

open environment, safety is a top concern and the areamust

be barricaded. Operators and personnel in the vicinity must

use ear protection and protective UV glasses. The process is

labor intensive and proper ventilation must be in place for

operator health. Further, aluminum metal dust is prone to

cause electric shocks and must be appropriately contained.

Once the coating process is underway, coated objects must

be handled with care using canvas slings and shrink wrap.

Proper masking to protect surfaces not to be coated is an-

other vital step that must occur before TSAC application.

Paying close attention to all of these parameters will enable

successful achievement of bond strength for a long and

maintenance-free service life with an optimized lifecycle

cost.

PROPER APPLICATION OF TSAC

OVERCOMES CONSTRAINTS

•

Repair/touch-up/patchwork are very difficult once TSA

application is complete, compared to conventional

paint. Therefore, the structure was released for TSA

coating only after all QA/QC reports were received and

cleared. All QA/QC requirements of such structures were

completed on time with the help of the QC team to avoid

any downtime. The slings of the assembly cranes were

wrapped with cloth and care was taken to avoid any

repairs.