August_EDFA_Digital

edfas.org ELECTRONIC DEVICE FAILURE ANALYSIS | VOLUME 20 NO. 3 30 degrees of metal voids along the high resistance path on the lower level metallization. The vias appeared to be intact and free of voids (Figs. 10, 11). CASE #4: BEOL OPEN FAILURES DUE TO MISSING VIA ON HEALTH OF LINE WAFERS Defect localization using RCI was conducted on a health of line (HOL) wafer at metal 9 with the metal stack (inguard ring) failing for “open.” Figures 12and13 illustrate the SEM/RCI overlay images obtained when the device at metal 9 was scanned in the SEM with a beam voltage of 2kV and beam current of 26 nA. FIB cross-sections of the EBAC/RCI site at metal 9 showed the “open” failure was due to a missing via 5 in the metal stack. Initial analysis was conducted with PVC, but failed to give observable contrast change when scanned in the SEM. PVC has been known not to be less sensitive or eƒective in producing clear contrast change on long repeating structures. [4] CASE # 5: FRONT END OF LINE (FEOL) SUBSTRATE MICROCRACKS Elevateddefectivenesswas reportedonanM1/CA/PC// RX structure. The failures were reported “open” at wafer Fig. 12 Health of line metal stack test structures on the guard ring. Initial PVC analysis did not show obvious contrast change in the structure of interest (guard ring), so RCI analysiswas done at the topmetal layer. RCI signal observed at 2 kV and 26 nA. Fig. 11 Further FIB cross-section shows where the metal line was almost completely “open.” Throughout the cross-sections, the vias appear to be intact. The issue was isolated to the copper plating process. Fig. 10 FIB cross-section SEM image of RCI site where metallization started showing partial metal voids in lower Cu metal line. Fig. 14 FIB cross-section SEM image highlighting themissing via 5 in the guard ring at the RCI/EBAC site shown in Figs. 12 and 13. Fig. 13 SEM/RCI overlay image highlighting the abrupt contrast (resistance) change on the guard ring at metal 9 (white arrow). The defect was isolated at metal 6 with the missing via A5. RCI signal observed at 2 kV and 26 nA. LOCATING FAILURES IN CURRENT DEVICE NODES (continued from page 27)

RkJQdWJsaXNoZXIy MjA4MTAy